Georges Vallerey Swimming Pool

Swimming pool renovation

Building

About the project

A century after it was built for the 1924 Olympic Games, the Georges Vallerey swimming pool has undergone a major renovation led by AIA Life Designers. The goal: to preserve the building's architectural identity while adapting it to modern needs and standards.

Launched in September 2022 and completed in March 2024, the project combined heritage restoration, technical modernization, and functional improvements. Stripping, concrete repair, equipment upgrades, and circulation compliance work have transformed an aging facility into a more comfortable, accessible, and high-performing space.

The building's signature retractable roof has been fully restored to maintain its innovative character and allow swimmers to enjoy natural light and fresh air.

The project also stood out for its commitment to sustainable construction and upcycling: part of the existing timber framework was repurposed to create furniture and signage, while a new eco-certified Douglas fir structure was prefabricated in a workshop and then assembled on-site.

Water and air treatment systems were modernized, while the reception areas, lighting, acoustics, and circulation paths were redesigned to improve the user experience and operational efficiency.

Completed in time for the Paris 2024 Olympic Games, the renovation of the Georges Vallerey swimming pool demonstrates that it is possible to evolve a historic building without sacrificing its identity, by balancing heritage, performance, and new uses.

‍

Photo: Georges Vallerey Olympic swimming pool in Paris © Hugo Hébrard.

Location

PARIS

Year

2024

Surface

8,878 m2

Project Owner

SOLIDEO

Project cost

€8.5 million (excl. tax)

Maître d'œuvre

AIA ARCHITECTES

The backbone of your projects

Discover how our platform can transform your project management.

Mezzoteam screens

Case studies

Discover other projects

See all projects
Industry and Energy

La Ciotat Shipyards

Construction of a new superyacht reception facility
Voir le projet
Transport and Infrastructure

Cayenne BRT

Design of a Bus Rapid Transit network
Voir le projet
Building

La Samaritaine – Store 3

Restructuring of Store 3 for retail and office use
Voir le projet
Health

Saint Côme Polyclinic

Extension and renovation of the clinic
Voir le projet
Health

Hospices Civils de Lyon

Renovation of Edouard-Herriot Hospital
Voir le projet
Industry and Energy

PSA Factory – Algeria

Construction of a new automotive plant in Algeria
Voir le projet
Health

MGEN Institute

Reconstruction of the La Verrière hospital facility
Voir le projet
Health

Centre Hospitalier de Lens

Construction du Pôle Hospitalier de la Gohelle
Voir le projet